Reidda Drive   May 2016                                                     Medina Home Builders Home

For Sale -- Almost Complete    $239,000 

They call this house the "Yeti" house because of all the insulation installed

 

 
Thunder the Horse

                       Project Supervisor - Thunder                            

 

Start Date  July 11, 2016   Ruben  Chapa    956- 212- 5948   Master  Plumber   

 

Iron Work - Rebar  7-25-16

 

Iron Work - Rebar  7-25-16

Form Builders -  Sergio Vidaurri   956-534 6971 

Thunder

Thunder,  Our Back Yard Neighbor Checking us Out

 

 

 

First Load of Concrete

First Load of Concrete  July 27. 2016

Sergio Vidaurri   956-534 6971 Superb Concrete Man in White

Sergio Vidaurri   956-534 6971 Superb Concrete Man in White

  It's Called a Screed - Hard Work Too

It's Called a Screed - Hard Work Too  - Smoothing out Concrete

Sergio Vidaurri 

Sergio  Smoothing it Out

  Hector is son of Sergio - He is a fine young man

Hector is son of Sergio - He is a fine young man

Andres Medina  -  Medina Home Builders

 

Thunderstorm on First Day  July 28,2016

First Day Framing  July 28,2016

   

Second Day Framing  July 29,2016

 
 
     

Rey Putting in Corner Braces

 

Corner Brace on Every Corner

Andres calculating angles and roof rafters

 

Big Beam across open space

     

Be careful Mr. Lee.  Be careful Mr. Lee

I like the Roof,  I might spend the night up here.

Don't roll out of Bed.

 

Martin, Fernando, Rickardo, Raul, Reynaldo 

 

 

Second Day Framing

 

Raul

Martin the Saw Man

 

Reynaldo  the Other Saw Man

Andres and Rey

 

Richardo

These Guys Come Ready to Work

 

Ice Chest with Coke, Sprite and Sometimes Bananas and Tomatoes 

Two Water Jugs - One With Water, One Gator Ade

 

Generator to 5 Plug Adaptor for Saws, Drills, Electric Impact

Air Compressor and 4000 Watt Generator

 

 

Air Compressor Feeds Big Air Bottle with Manifold for 4 Nail Guns

Martin and Fernando 

 

Extra Long Roof Rafter

     
     

Plumbing Problem - 8 inches forward

 

Plumbing Repair 8 inches Back

     
 
 
 

Back Porch Ceiling

 

Framing Day 5  -  Looks Like a House Now

Tar Paper

 

Andres and Raul Medina - 7 Days to Build this House

Finish Framing - Took One Week to Frame

 

Scrapes to the Landfill

  GARCIA ELECTRIC

Ray Garcia Starting on Electricity

 

Wiring Finished in One Day

 

Front Door   August 2016

 

Laying Shingles Aug 23, 2016

Shingles Aug 23, 2016

 

Roof Going On Aug 24, 2016

Roof On Aug 25, 2016

 

 

Front Door -- I see that ghost too!

Washing Machine / A/C Drain

 

Master Bath Shower

Full Bathtub Indicates No Pinhole Leaks

 

Main Electrical Box

PolyEurethane in Rafters Fiberglass Batt in Walls

 

Insulation Behind Electrical Boxes

  Sept 2016  Rhis and Thunder  Something about Girls and Horses

Insulation in Rafters

 

Insulation around Windows

Reidda Drive  Hershey Bar

Polyurethane in Attic

 

Sheet Rock in Progress  Sept 2016

5 Foot Stilts Circus Tall Man

Sheet Rock Man on His  5 Foot Stilts  --  Circus Tall Man

  Tape and Float on Stilts

Tape and Float on Stilts

Sept 9, 2016

 

First Paint Job on Walls and Ceiling

Sept 15,  2016

 

Sept 21   Fillipe  the Painter got started

ATT  working in Backyard

 

 

Sept 14,  2016

Ricardo on Bobcat

Sept 15,  2016  
Mixing Mortor for Brick

Mixing Mortar for Brick

  Taide Gamez  Master Bricklayer   Sept  23, 2016

Taide Gamez  Master Bricklayer   Sept  23, 2016

Acme Comal River Brick

Acme Comal River Brick

 
 

Acme Comal River Brick

 
 
 

Stain Man

 

Hall Bathroom Sept 29 ,  2016

Sept 29 ,  2016   Master Bath Cabinet

 

Sept 29 ,  2016   Master Bath Shower

Jose  Lucio

 

Mathius Gamez   Master Bricklayer

Juan Jimeniz  Tile Man for 45 Years

 

Son David Jimeniz  Tile Cutting

Jimeniz Tile - Bathrooms and Floors 

 

Hall Bathroom  Oct  2016

 

 

Taide Building the Back Column

  Alamo Garage Door

Installing Insulation in Garage Door

Christo New Mirror and Twin Arches   

 

Christo Glass and Mirror   Commercial Residential

Frame around Shower

Frame around Shower

  Kitchen with Lights

Kitchen with Lights

Entry Hall and Return Air

Entry Hall and Return Air

 

Blown in Fiberglas Insulation on Ceiling Throughout House

 
 

New Fencing

 

New Fencing Behind House

October  2016

   

Nov 28,  2016

Dec  2016

   
     

                                                          